Disassembly-in-Theory
This article is a placeholder. Only its topic and title are committed at this stage; the substantive body will be drafted in a future cycle of the engine.
Designing a building “for disassembly” with no operational, contractual, or financial mechanism to ensure the disassembly will ever happen — no material passport that survives the design team, no deconstruction contract template, no salvage marketplace relationship, no incentive on the future owner. The entry uses the gap between celebrated DfD pilot designs and their unverified end-of-life claims as evidence.