Pre-Demolition Material Audit
This article is a placeholder. Only its topic and title are committed at this stage; the substantive body will be drafted in a future cycle of the engine.
Before issuing a demolition permit, complete a structured audit of recoverable materials, components, and assemblies in the existing building, scored for reuse potential and feeding into either a material-passport, a salvage-marketplace listing, or a deconstruction tender. The entry covers the EU pre-demolition-audit guidance and how various jurisdictions are now requiring it.